LEADING CAUSES OF WORK RELATED INJURIES


Manual Excavation 

 

Potential Hazards

 

•            Unskilled personnel involvement

•            Personnel hit by hand tools due to SIMOPS

•            Concrete paved area/hard surface

•            Excavation collapse

•            Use of damage tools

•            Falling objects

•            Working in confined space

•            Dust

 

CONFINED SPACE SAFETY TRAINING




BOOM LIFT, DOZER (Bulldozer) - PICTORIAL CHECKLIST


Hazard Controls

 

•            Deliver tool box talk to all of workforce prior to commence the activity

•            Ensure Hand tools are inspected & colour coded

•            Dump concrete material away from trench

•            Workers should keep a reasonable distance during manual excavation

•            Ensure Close HSE monitoring

•            Ensure proper shoring/ramping/benching of deep excavations (as required)

•            Working areas should be clearly marked & hard barricaded

•            Be careful of overhead structures/objects

•            Restrict unauthorized personnel & movement in live areas

•            Proper coordination with Team regarding all works

•            Stop work in case exposing of any underground utilities 

 

 4 - WORK AT HEIGHT PRECAUTIONS - 

PICTORIAL TRAINING ( 4 )


Mechanical Excavation

 

Potential Hazards

 

•            Personnel/Structures hit by Equipment/Heavy Vehicle,

•            Striking of vehicles with scaffolding structure/foundations

•            Personnel hit by Movement of heavy vehicles/equipments

•            Excavation collapse

•            Personnel/Equipments fall in excavated place

•            Falling objects

•            Fire explosion

•            Slip, Trip & fall

•            Inclement weather condition

 

 FREE - Training Module on PERMIT TO WORK


Hazard Controls

 

•            Deliver tool box talk to all of vehicles drivers & operators

•            Banks men should be available at site

•            Keep away all unauthorized people during movement of heavy vehicle/equipments

•            Ensure Close HSE monitoring /supervision

•            Be careful of nearby structure/foundation

•            Flame arrestor to be installed in vehicles

•            Deliver tool box talk to all drivers/optrs

•            Banks man should be available at site

•            Restrict People during movement of heavy vehicle/equipments

•            Ensure proper barrication of excavated area also display safety signs

•            Close HSE monitoring /supervision

•            Ensure proper shoring/ramping/benching of deep excavations (as required)

•            Excavated area should be properly hard barricaded

•            Keep access/walk ways always clear from any obstruction

•            Stop work in case of any inclement weather conditions (Rain, storm, fog etc.) 

•            Restrict movement of heavy vehicles/equipment's in rain/fog


LOTO – Lockout Tagout